| |
Location: | Ahaus, Germany |
Operator: | Erka Maschinenbau Gmbh |
Commissioning: | 2/3/2016 |
| |
| |
| |
PV system power: | 313.350 kWp |
Annual Production: | approx. 256,320 kWh (818 kWh/kWp) |
CO2 avoided: | Approx. 179.4 tons per annum |
| |
| |
| |
Communication: | SMA Cluster Controller |
Inverter: | 6 x Sunny Tripower 25000TL-30 6 x Sunny Tripower 20000TL-30 |
| |
| |
| |